Simple Construction Schedule & Gantt Tracker

The Construction Schedule & Gantt Tracker gives you that written, living programme. It sequences the key tasks the way a small residential build actually happens — site mobilization, excavation, foundation, superstructure walling, ring beam, roofing, first-fix electrical and plumbing, windows and doors, plastering, second fix, tiling, painting, external works, and snagging through to handover. Set your project start date once and enter planned start/end dates per task; the workbook builds a 24-week Gantt chart automatically, with each task’s planned window shaded in blue. As work actually happens, fill in actual start/end dates and % complete — the bar for that task switches to green, and a Status column flags anything running past its planned end date as “Delayed” in red, so slippage is visible the moment it happens rather than three site visits later.

KSh 100.00

Add to Wishlist
Add to Wishlist
Category:

Description

See your entire build timeline at a glance — and see delays coming before they cost you.

Ask most Kenyan homeowners how long their build is supposed to take and they’ll give you a number their contractor mentioned once, verbally, months ago. There is rarely a written programme, and almost never one that gets updated as the project actually moves. That’s how a “6-month build” quietly becomes ten, with nobody able to say exactly when or where it went off track.

The Construction Schedule & Gantt Tracker gives you that written, living programme. It sequences building tasks the way a small residential build actually runs — site mobilization, excavation, foundation, superstructure walling, ring beam, roofing, first-fix electrical and plumbing, windows and doors, plastering, second fix, tiling, painting, external works, and snagging through to handover. Set your project start date once and enter planned start/end dates per task; the workbook builds a 24-week Gantt chart automatically, with each task’s planned window shaded in blue. As work actually happens, fill in actual start/end dates and % complete — the bar for that task switches to green, and a Status column flags anything running past its planned end date as “Delayed” in red, so slippage is visible the moment it happens rather than three site visits later.

Key features

  • 19-task programme pre-sequenced for a typical small residential build, editable to match your own contractor’s plan
  • Automatic 24-week Gantt chart driven entirely by formulas — change the project start date and every week header and bar shifts with it
  • Planned (blue) vs Actual (green) bar shading so plan-vs-reality is visible in one glance, no separate chart needed
  • Automatic Status column (Not Started / In Progress / Complete / Delayed) based on your actual dates and today’s date
  • Built entirely on native Excel formulas and conditional formatting — no macros, no add-ins

Who it’s for: Owner-builders who need a real programme to hold their contractor accountable to; diaspora clients tracking build progress remotely against a written timeline; contractors who want a professional-looking schedule to issue to clients.

What’s included: One Excel workbook (.xlsx) — Schedule tab with built-in Gantt chart, and an Instructions tab.

Reviews

There are no reviews yet.

Be the first to review “Simple Construction Schedule & Gantt Tracker”

Your email address will not be published. Required fields are marked *